How do you perform cost estimation for a construction project?

Writer's picture: BHADANIS Quantity Surveying and Construction Management Training Institute for Civil Engineers & Construction Professionals OnlineBHADANIS Quantity Surveying and Construction Management Training Institute for Civil Engineers & Construction Professionals Online

Performing cost estimation for a construction project is like putting together the pieces of a financial puzzle. You need to consider every aspect of the project, from the materials and labor to the equipment and potential risks, to get an accurate picture of how much the entire project will cost. Let’s go through the process step by step, using the example of a foundation for a G+25 residential building in Kuwait.


1. Understanding the Project Scope

The first step in cost estimation is to understand the full scope of the project. This means knowing exactly what the project entails and what needs to be built. For our example, we’re dealing with the foundation of a G+25 residential building, which is quite significant given the height and load that the foundation must support.

You need to ask questions like: How deep does the foundation need to be? What type of foundation is required—piles, mat foundation, or a combination? What are the soil conditions in Kuwait, and how will they affect the design and materials needed?



2. Break Down the Work into Components

Next, you’ll break down the project into smaller, manageable components, often using a Work Breakdown Structure (WBS). This helps you organize the project into distinct tasks or phases, making it easier to estimate costs for each part.

For the G+25 residential building foundation in Kuwait, the WBS might include:

  • Site Preparation: Clearing the site, leveling the ground, and setting up temporary facilities.

  • Excavation: Digging out the area where the foundation will be placed.

  • Foundation Design: Engineering and design work to ensure the foundation can support the building.

  • Reinforcement and Formwork: Installing steel reinforcement bars (rebar) and creating the forms for the concrete.

  • Concrete Pouring: Pouring the concrete into the forms to create the foundation.

  • Curing and Inspection: Allowing the concrete to cure (harden) and inspecting the work to ensure it meets quality standards.



3. Quantify the Required Resources

Once you have the project broken down into components, the next step is to quantify the resources needed for each part. This includes calculating the quantities of materials, the amount of labor, and the type and duration of equipment use.

For example:

  • Materials: Estimate the amount of concrete, steel rebar, and other materials needed. For a G+25 building, the foundation will require a significant amount of high-strength concrete and rebar.

  • Labor: Calculate the number of workers needed for each task, such as excavation, formwork, and concrete pouring, and the number of hours they’ll need to complete their work.

  • Equipment: Determine the machinery required, such as excavators, cranes, and concrete mixers, and estimate how long they’ll be needed.



4. Determine Unit Costs

After quantifying the resources, you need to determine the unit costs for each one. This means finding out how much each material, hour of labor, and equipment rental will cost. These costs can vary depending on local market conditions in Kuwait.

For example:

  • Concrete: The cost per cubic meter of high-strength concrete.

  • Rebar: The cost per ton of steel reinforcement bars.

  • Labor: The hourly wage rates for skilled workers like engineers, laborers, and equipment operators.

  • Equipment: The daily or hourly rental rates for machinery like cranes and concrete pumps.



5. Calculate the Total Costs


With the quantities and unit costs in hand, you can now calculate the total costs for each component of the project. Simply multiply the quantity of each resource by its unit cost to get the total.

For instance:

  • Excavation: If you need 500 cubic meters of soil to be excavated and the cost is 10 Kuwaiti Dinars (KWD) per cubic meter, the total cost for excavation would be 500 x 10 = 5,000 KWD.

  • Concrete: If the foundation requires 1,000 cubic meters of concrete at 25 KWD per cubic meter, the total cost for concrete would be 1,000 x 25 = 25,000 KWD.


6. Include Indirect Costs and Contingencies


Indirect costs, such as project management, permits, and insurance, also need to be included in the estimate. Additionally, it’s important to add a contingency amount to cover unexpected expenses, such as price increases in materials or unforeseen site conditions.

For the residential building in Kuwait, you might add:

  • Project Management: The cost of salaries for the project management team.

  • Permits and Inspections: Fees for obtaining necessary permits from local authorities and for mandatory inspections.

  • Contingency: A percentage of the total estimated cost, typically 5-10%, to account for any unforeseen expenses.


7. Review and Refine the Estimate


Once you’ve calculated all the costs, it’s important to review the estimate carefully. Compare it against historical data from similar projects, consult with experts, and refine it as needed to ensure accuracy.

For example, you might compare your estimate for the G+25 building foundation with similar projects completed in Kuwait. If your estimate is significantly higher or lower, investigate why that might be—perhaps due to differences in site conditions or material costs.


8. Present the Estimate


Finally, you’ll present the cost estimate to the stakeholders, such as the client, project manager, and finance team. Make sure to provide a clear breakdown of the costs and explain how you arrived at each figure. This transparency helps build trust and ensures that everyone understands the financial requirements of the project.

For the residential building in Kuwait, you might present the estimate in a detailed report, showing the costs for each component, along with notes on any assumptions or risks that could affect the budget.


Real-World Example: Residential Building Foundation in Kuwait


Let’s tie this all together with a practical example. Suppose you’re estimating the cost for the foundation of a G+25 residential building in Kuwait. After breaking down the project into components and quantifying the resources needed, you calculate the following:

  • Site Preparation: 15,000 KWD

  • Excavation: 5,000 KWD

  • Foundation Design: 10,000 KWD

  • Reinforcement and Formwork: 30,000 KWD

  • Concrete Pouring: 25,000 KWD

  • Curing and Inspection: 7,000 KWD

  • Indirect Costs and Contingencies: 10,000 KWD

This gives you a total estimated cost of 102,000 KWD. You then review the estimate, refine it based on any new information, and present it to the client along with a detailed breakdown.



Construction Cost Estimation Template

Step

Description

Example Details

Estimated Cost (KWD)

1. Understanding the Project Scope

Define the overall project requirements and objectives.

- Foundation for a G+25 residential building.


- Consider soil conditions, depth, and type of foundation needed.

[Cost Estimate]

2. Breaking Down the Work

Divide the project into manageable tasks or components using a Work Breakdown Structure (WBS).

- Site Preparation


- Excavation


- Foundation Design


- Reinforcement and Formwork


- Concrete Pouring

[Cost Estimate]

3. Quantifying Required Resources

Calculate the quantity of materials, labor, and equipment needed for each component.

- Concrete (cubic meters)


- Steel Rebar (tons)


- Labor (man-hours)


- Equipment (hours/days of use)

[Cost Estimate]

4. Determining Unit Costs

Identify the cost per unit of each resource, considering local market rates.

- Concrete: 25 KWD/cubic meter


- Rebar: 400 KWD/ton


- Labor: 10 KWD/hour


- Equipment: 150 KWD/day

[Cost Estimate]

5. Calculating Total Costs

Multiply the quantity of each resource by its unit cost to get the total cost for each task/component.

- Excavation: 5,000 KWD


- Concrete Pouring: 25,000 KWD


- Reinforcement: 30,000 KWD

[Cost Estimate]

6. Including Indirect Costs and Contingencies

Add indirect costs like project management, permits, and contingencies to cover unexpected expenses.

- Project Management: 10,000 KWD


- Permits and Inspections: 5,000 KWD


- Contingency: 10,000 KWD

[Cost Estimate]

7. Reviewing and Refining the Estimate

Check the estimate against similar projects, adjust for accuracy, and refine based on expert feedback.

- Adjust for material price fluctuations.


- Compare with previous projects in Kuwait.

[Adjusted Cost]

8. Presenting the Estimate

Prepare a detailed report with the cost breakdown and present it to stakeholders for approval.

- Detailed cost breakdown


- Notes on assumptions and potential risks

[Final Estimate]

Explanation of Columns

  • Step: The key steps involved in the cost estimation process.

  • Description: A brief explanation of each step.

  • Example Details: Specific details or examples related to the residential building foundation project in Kuwait.

  • Estimated Cost (KWD): The estimated cost in Kuwaiti Dinars for each component or step.