In underground tunnel construction, quality control is the difference between a safe, durable tunnel and a costly failure. Poor workmanship, inadequate support or overlooked leaks can lead to collapses, water ingress or safety hazards.
Who this helps
This post serves QA/QC engineers, site supervisors, geologists and project managers involved in tunnel projects for metros, highways and hydropower in India and the GCC.
Foundations: Key elements of tunnel projects
A tunnel project typically includes excavation (drill-and-blast or TBM), primary support (shotcrete, lattice girders, rock bolts), waterproofing membranes, final lining (cast-in-situ concrete or precast segments), drainage, ventilation and MEP installations. Quality control must verify that each component meets design specifications and complies with safety codes.
Step-by-step quality control process
1. Preconstruction: Review geotechnical data, design drawings and method statements; verify materials certificates and calibration of instruments.
2. Excavation monitoring: Measure overbreak and underbreak after each advance, check blasting patterns or TBM parameters and monitor ground settlement with instruments like extensometers and piezometers.
3. Support installation: Inspect shotcrete thickness, rebound and strength; confirm the length and torque of rock bolts and installation of mesh/lattice.
4. Waterproofing and drainage: Check seams and overlaps of membranes, test water-tightness and ensure drains are unclogged.
5. Final lining: Measure formwork alignment, reinforcement placement, concrete slump, temperature and compressive strength; perform core sampling if required.
6. MEP and finishes: Verify installation of ventilation ducts, lighting, walkways, emergency exits and signage according to specifications.
Quality parameters example
Parameter | Criteria | Frequency | Responsibility
Shotcrete thickness | ≥ 100 mm average | Each advance | QA/QC Engineer
Rock bolt pull-out test | ≥ 80 kN | One per 20 bolts | Site Engineer
Waterproof membrane seam test | No leakage under 0.5 bar pressure | Each seam | QA/QC Technician
Concrete compressive strength | 30 MPa at 28 days | Every pour | Laboratory
Formula example
Circular tunnel cross-sectional area = (π × diameter²) ÷ 4
India vs GCC site notes
Indian tunnel projects follow IS codes and guidelines from the Ministry of Railways or IRC, while GCC projects may adopt Eurocode or NATM guidelines with stricter fire and ventilation requirements due to long road tunnels. GCC tunnels often use precast segmental linings with gaskets to handle groundwater pressures and require intensive fireproofing.
Common mistakes and how to fix them
- Neglecting geological mapping; fix by documenting rock classes at each face and adjusting support accordingly.
- Skipping calibration of monitoring instruments; fix by scheduling regular calibration and logging results.
- Inadequate curing of shotcrete or concrete; fix by maintaining curing regimes and monitoring temperature.
- Poor waterproofing joint preparation; fix by training crews and inspecting overlaps before covering.
- Ignoring small leaks; fix by injecting grout or installing drainage before problems worsen.
Mini QA/QC checklist
- [ ] Approve method statements before work starts.
- [ ] Verify material certificates and shelf life of chemicals.
- [ ] Measure excavation profile after each blast or TBM ring.
- [ ] Record ground monitoring data and interpret trends.
- [ ] Test shotcrete thickness and strength regularly.
- [ ] Check bolt spacing, angle and torque.
- [ ] Inspect waterproofing seams and test joints.
- [ ] Ensure concrete mix design and temperature control.
FAQ
**What is the acceptable overbreak limit?** Typically 10% of design profile or as specified in the contract.
**How are leaks handled?** Small leaks can be sealed with polyurethane grouting; larger leaks may require drainage and redesign.
**Which standards apply?** Use relevant IS codes, EN 1997 Geotechnical Design and project-specific NATM specifications.
For deeper learning, see our courses Tunnel Estimation & QA/QC (https://www.bhadanisrecordedlectures.com/s/store), Construction Project Planning & Management Level 5 (https://www.bhadanisrecordedlectures.com/s/store) and Tendering & Construction Contracts Management Level 3 & 4 (https://www.bhadanisrecordedlectures.com/s/store).
Level up with BHADANIS – Quantity Surveying & Estimation Level 1 (https://www.bhadanisrecordedlectures.com/s/store)
Comments